• Client:Thames Water PLC
  • Type:

Project Overview

Following a comprehensive, plant-wide inspection of the GAC Plant, the existing cyclones were found to be significantly degraded due to long-term wear and tear. To ensure continued operational efficiency and compliance, a decision was made to fully replace the cyclones across three Thames Water sites as part of the wider GAC Plant refurbishment programme.

The Challenge

The cyclones play a critical role in separating sand and Granulated Activated Carbon (GAC), allowing the carbon to be recovered and reused within the freshwater filtration process. Their deteriorated condition posed a risk to both performance and reliability, requiring a coordinated replacement programme across live operational sites.

Our Solution

Each cyclone was individually surveyed to verify specifications and ensure the correct replacement units were sourced. In accordance with Thames Water site requirements, all necessary documentation and permits were prepared, submitted, and approved prior to the commencement of works.

Fully trained and certified personnel were assigned to the project, ensuring all activities were carried out to the highest technical and safety standards.

Project Delivery

Across the three sites, four cyclones per site were safely removed and replaced. Specialist lifting equipment was used to manage the removal and installation of the units, with all works conducted in a controlled environment to minimise disruption to ongoing operations.

Safety and Compliance

All works were delivered in full compliance with CDM Regulations. The project was executed with a strong focus on safety, planning, and coordination, ensuring a smooth and incident-free installation process at each location.

Outcome

The successful replacement of all cyclones restored the integrity of the separation process, enabling continued reuse of Granulated Activated Carbon and supporting the long-term performance of the GAC Plant across all three Thames Water sites.

STRUCTURAL STEELWORK

Fabrication and installation of structural steelwork, buildings & plant

DEMOLITION SERVICES

A wealth of knowledge in all aspects of demolition & dismantling industry.

Quarry Services

Design, fabrication, supply and installation for the aggregate and quarry industries.

Farm Buildings

Made to measure farm buildings.

Cattle Handling Systems

Livestock facilities including handling systems, lairage and raised pedestrian access.

Plant Hire

A variety of machines for hire nationwide.

Need our services?

Get in touch

Contact

Thor Atkinson Steel Fabrications Ltd.
Fabrication House
Newland, Ulverston
Cumbria, LA12 7SH

T: 01229 861 859E: thor@thoratkinson.co.uk

Services

Copyright © 2026 Thor Atkinson Steel Fabrications Ltd  |  Website managed by Furness Media 
menu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram